Lapataiga mo le faʻapipiʻiina ma faʻataʻitaʻi masini o matau ituaiga fana fana pa malulu¼ˆ

2021-06-03

O lemātau ituaiga pu fana masinie masani ona i ai se lapoʻa foliga vaaia, ma o le faʻapipiʻiina gaioiga e sili atu ona faigata nai lo o tamaʻi masini. Saʻo faapipiiina ma tofotofoga masini o le ki i le faamautinoaina o le masani faagaoioia o le mulimuli ane masini. I le tulaga o le le faʻatautaia muamua o galuega, e manaʻomia e tagata faʻaaoga le matua mulimulitaʻi i faʻatonuga a le aufaigaluega talafeagai pe vaʻai i faʻatonuga. Ole faʻagaioiga le faʻatagaina e mafai ai ona faʻafaigofie ona toe faʻaleagaina lemātau fana fana masini. O leshot blasting machine manufacturer has sorted out the precautions for installation and test machine to share with you. I hope it will be helpful to users who use the device for the first time.
1. Installation. O lemātau ituaiga pu fana masini is installed and debugged in the production plant and disassembled into several parts before being transported to the user site for installation. Although there is no pit, the foundation must be firm, the anchor bolt holes must be standardized, and the chamber body must be adjusted. After the second irrigation, the anchor bolt nuts can be tightened after solidification. After the chamber body is fixed, the various parts can be installed. O leprecautions for the installation and debugging of the relevant components are introduced below.
1. Fanaina blasting masini:
O leshot blasting device has been installed on the chamber body before leaving the factory. Please pay attention to the problems to be debugged before use. Check whether the fixed positions of the blade, the pill wheel, the directional sleeve, and the guard plate are accurate and firm, and check whether the direction of rotation is correct after power on. Then adjust the position of the directional sleeve opening. Theoretically, the angle between the front edge of the directional opening and the front edge of the blade throwing position is about 900. After fixing the position of the directional sleeve, the position of the projectile belt can be detected by hanging Place a steel plate or wooden board on the position of the workpiece facing the exit of the shot blasting machine, start the shot blasting machine, put a small amount (2-5kg) of projectiles into the blasting tube, and then stop, check whether the hit position on the steel plate is suitable for the needs, such as Close the window of the bias-adjustable directional sleeve downwards, and vice versa, until it fits, and note the position of the directional sleeve opening as a basis for future replacement of the directional sleeve.
2. Faʻamau ma faovilivili conveyor:
Muamua faia se leai-avega suʻega e siaki pe o le sisiina pakete ma liʻo fusi o loʻo tamoʻe i le saʻo itu, ona faʻamau le fusipau o le sisi i luga i se feololo tikeri o le feteʻenaʻiga e aloese ai mai le faʻaletonu, ona faia ai lea o se avega suʻega e siaki o le faʻagaioiga ma le faʻaaogaina gafatia, pe i ai se uiga uigaese Leo ma gatete, siaki ma aveʻese faʻafitauli.
3. Tuʻueseʻesega oneone-oneone:
Muamua siaki pe o le gaioiga o le mamoe poʻa e fetuʻutuʻunaʻi, ona siaki lea o le tulaga saʻo o le vavaeʻese ipu, ona a o le faʻamau ua utaina ma debugging, o loʻo i ai pea le faʻaaogaina o uʻamea fana, ma siaki pe o le uʻamea tipi o loʻo tafe mai ma paʻu pe a uma le chute
  • QR
We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies. Privacy Policy